久久精品国产只有精品

  • <small id="ousky"></small><xmp id="ousky"><li id="ousky"></li>
  • <xmp id="ousky"><td id="ousky"></td><td id="ousky"></td><small id="ousky"><td id="ousky"></td></small>
  • <small id="ousky"><td id="ousky"></td></small>
  • <small id="ousky"><li id="ousky"></li></small>
  • <small id="ousky"><li id="ousky"></li></small>
  • <td id="ousky"></td>
  • <td id="ousky"></td><small id="ousky"></small>
  • <td id="ousky"></td>
  • Data Center Map

    Flexential Raleigh


    » Index » USA » North Carolina » Raleigh » Flexential Raleigh

    Flexential Raleigh is located in the area Raleigh, USA (America), and the colocation data center is carrier neutral. The data center was last updated on 21-01-2019.


    Address:
    Flexential
    5150 McCrimmon Parkway
    27560 Morrisville
    North Carolina, USA

    » Request quote
    » Visit website

    Click here to find other data centers
    owned and operated by Flexential.


    Profile
    Tenants
    Connectivity
    Request quote
    Office space
    Rack Cabinets
    Dedicated Servers
    Suites
    Footprints
    Virtual Servers
    Cages
    Hosting of individual servers
    Remote Hands

    Profile


    Flexential is a powerful combination of Peak 10 + ViaWest.

    General Facility Features

    More than 27,000 square feet of total floor space located in two separate, but contiguous data centers on the Peak 10 Raleigh campus
    Cabinets - 19" and 23" half or full available
    Custom cages
    AC power
    Raised Floor
    24x7x365 customer access
    24x7x365 Network Operations Center
    Data Center One Features:
    - 15,500 Square Feet
    - Under Floor Power Distribution and Cable Management
    - 18" Raised Floor
    Data Center Two Features:
    - 12,000 Square Feet
    - Under Floor Power Distribution and Cable Management
    - 24" raised floor
    Security Systems

    Biometric Fingerprint Readers
    Card/PIN Access
    Combination Lock Cabinets
    24x7x365 Monitored Video Surveillance
    Motion/Vibration Detectors
    Environmental Controls/Redundancy

    Redundant Backup Power
    N + 1 UPS Systems
    6.25 Megawatt N + 1 Generator Farm
    Redundant Network Infrastructure
    Controlled Temperature and Humidity Via HVAC Units
    Dry Pipe/Gas Dual-action Fire Suppression System
    Geographic diversity/redundancy via other Peak 10 data centers
    Data Center One Features:
    - N + 1 UPS System
    - 6.25 Megawatt N + 1 Generator Farm
    - Dry Pipe/Gas Dual-action Fire Suppression System
    Data Center Two Features:
    - N + 1 UPS System
    - 6.25 Megawatt N + 1 Generator Farm
    - Dry Pipe/Gas Dual-action Fire Suppression System
    Internet/Access Options

    Burstable up to 100 Mbps or More
    Diverse Fiber Entry Points-- OC-12 up to OC-192
    Internet / Network Access Options- DS-1, DS-3 or OC-X Connectivity
    Native LAN at 10 Mbps, 100 Mbps to Gbps Ethernet Connectivity
    ATM
    Frame relay
    ISDN (BRI, PRI)
    Redundant Internet with multiple Tier 1 providers
    Local Loop Access - Verizon Business, TW Telecom, Time Warner Cable, AT&T and Level 3
    Metro Ethernet at 10 Mbps, 100 Mpbs, 1 Gbps, and 10 Gbps


    Flexential Raleigh Pricing/Quotes


    If you are interested in receiving a quote for Flexential, please try our free quote service.

    Copyright © Data Center Map - Sitemap
    Your guide to colocation data centers, managed hosting, cloud servers etc.
    久久精品国产只有精品
  • <small id="ousky"></small><xmp id="ousky"><li id="ousky"></li>
  • <xmp id="ousky"><td id="ousky"></td><td id="ousky"></td><small id="ousky"><td id="ousky"></td></small>
  • <small id="ousky"><td id="ousky"></td></small>
  • <small id="ousky"><li id="ousky"></li></small>
  • <small id="ousky"><li id="ousky"></li></small>
  • <td id="ousky"></td>
  • <td id="ousky"></td><small id="ousky"></small>
  • <td id="ousky"></td>