iTech Tower 2 Data Center is located in the area Hong Kong, Hong Kong (Hong Kong, SAR of China), and the colocation data center is carrier neutral. The data center was last updated on 10-01-2014.
Our high-tier data centres are designed and built for the requirement of high availability. We leverage the strength of our parent company in building construction, and have the professional team to ensure the data centre environment could support 24x365 mission critical operation. Our customers included multi-national data centre operators, telecommunication companies and financial institutions.
54-56 Ta Chuen Ping Street, Kwai Chung 15-storey building of GFA ~98,000sq.ft Custom built data centre with dual path for electrical and telecom cabling slab-to-slab >5m, floor loading of 12-20kPa Utility Power from CLP transmission ring to provide dual 11kV feed, dedicated transformers for data centre use Diesel generators with onsite fuel storage to support continuous operation Uninterruptible Power Supply UPS with 15 minutes battery backup to support mission critical operation Computer Room Air Conditioning to control the temperature and humidity Highly efficient chillers with redundancy to maintain the computer room environment Gas based fire suppression system Inergen/FM200 and / or pre-action sprinkler system BMS to monitor all critical facilities
iTech Tower 2 Data Center Pricing/Quotes
If you are interested in receiving a quote for Grand Ming Group Holdings Limited, please try our free quote service.