黑人与中国女人AV免费观看

                                      Data Center Map

                                      GDCL


                                      » Index » Canada » Windsor » GDCL

                                      GDCL is located in the area Windsor, Canada, and the colocation data center is carrier neutral. The data center was last updated on 01-04-2012.


                                      Address:
                                      MNSi Internet
                                      1163 Goyeau Street
                                      N9A 1H9 Windsor
                                      Ontario, Canada

                                      » Request quote
                                      » Visit website

                                      Click here to find other data centers
                                      owned and operated by MNSi Internet.


                                      Profile
                                      Tenants
                                      Connectivity
                                      Request quote
                                      Office space
                                      Rack Cabinets
                                      Dedicated Servers
                                      Suites
                                      Footprints
                                      Virtual Servers
                                      Cages
                                      Hosting of individual servers
                                      Remote Hands

                                      Profile


                                      -Purpose built in 2009 cast in place reinforced concrete building
                                      -CLLI WNDSON17 - 1163 Goyeau St, Windsor
                                      -Directly next door to Bell Canada CO - WNDSON12 (1149 Goyeau Street)
                                      -Diverse fibre entrances to building
                                      -600Kw generator with 48 hour fuel supply on site
                                      -soft transfer system for generator allows non-disruptive weekly full load testing
                                      -100Kw UPS with 2 hour battery - provision for 3 additional units
                                      -48 VDC Power for Telecom
                                      -24 hour video monitoring
                                      -3 layer overhead racking for signal, power and fibre cables.
                                      -Mitsubishi City Multi heat pump cooling systems with redundancy - no glycol loops in building.
                                      -FM200 fire suppression system
                                      -Connectivity to Level3, Bell Canada and Cogeco Data existing
                                      -Connectivity to Telus, MTS Allstream, and Hydro One Telecom available
                                      -Fibre connectivity to all Windsor, Ontario Bell Canada wire centres.


                                      GDCL Pricing/Quotes


                                      If you are interested in receiving a quote for MNSi Internet, please try our free quote service.

                                      Copyright © Data Center Map - Sitemap
                                      Your guide to colocation data centers, managed hosting, cloud servers etc.
                                      黑人与中国女人AV免费观看